SANJAY VIDYUT PARIYOJNA

SANJAY VIDYUT PARIYOJNA BHABA, INDIA

23 metre high concrete Diversion Dam/Barrage, intake structure with undersluices, spillweir and gates, desilting tanks with underground silt ejecting pipes, storage reservoir, coffer dams and other appurtenant works in Kinnaur District, Himachal Pradesh, India





Excavation
Concrete
Reinforcement Steel
River Diversion:
-Coffer Dam
-Cunnettes
Filters
Purpose

Client












-226,000 cum
-120,600 cum
-5,500 MT

-15,000 cum
-12,000 cum
-3,900 cum
-Hydro Power Generation
(120 MW)
-Himachal Pradesh State
Electricity Board, Shimla,
India







View of Intake Structure
The Construction work was carried out in extreme cold weather conditions and the project area remains snow bound for four months in a year.The Works were carried out at an elevation of 2450 Metres above MSL, which is the highest elevation at which a project of this nature has been constructed in the country.

View of Diversion, Intake Structure and Storage Reservoir

Other Projects:
CHAMERA HYDRO-ELECTRIC PROJECT
MANERI BHALI HYDROELECTRIC PROJECT
NARMADA MAIN CANAL PROJECT
SHANAN EXTENSION PROJECT
LOWER JEHLUM HYDEL PROJECT
WADI GHAN DAM, LIBYA
OBRA DAM AND POWER HOUSE
TAWA MASONRY DAM
TENUGHAT DAM
CONCRETE DAM AT PORT BLAIR