LOWER JHELUM HYDEL PROJECT, INDIA Concrete Barrage with road bridge, headrace open channel and 8 metre dia cut and cover RCC Conduit, rock excavation, diversion channel, foundation treatment and other appurtenant works at Baramulla, Jammu and Kashmir, India. The work site is situated at EL 1600 M above MSL.It remains snow bound for 4 months in a year.Work was executed round the clock in difficult hilly terrain under adverse weather conditions to meet completion deadlines. |
|
-10 bays of 13M each -8M dia 1100M long cast-in-situ -2,320,000 cum -100,000 cum -Hydro Power Generation(105 MW) -Govt.of Jammu & Kashmir, India |